HACCP records
Day-to-day temperatures, cleaning and pest control, with the checks that come from the plan.
Daily HACCP →Home › Features › HACCP plan
HACCP plan
The food safety authority asks for a HACCP plan as well as the records. Recipok drafts it with what you have already loaded, guides you step by step and gives you the manual as a PDF. Recipok proposes; you decide and sign.
Free extension on any plan, Free included · Based on Regulation (EC) 852/2004 and the Codex
Type Full · 3 process families
| Done |
|---|
| 12 prerequisites answered |
| Product sheets |
| Diagram verified on site |
| Still to do |
|---|
| Approve 2 hazards |
| Critical limit for baking |
| Management signature |
Example with sample data.
How it is done
You choose a representative recipe from each process family and Recipok creates the draft. Then you go through it step by step.
A plan that gets used
What you already have
Product sheets arrive with the composition, the allergens and the preparations they cover. The diagram comes from your recipes' processes, and suppliers go into an annex of the manual.
Product sheet · Laminated pastries
From the plan to every day
A critical control point becomes a daily check at a location, such as a cold room or goods-in, or is monitored on the production order of each lot, such as baking.
Critical control points
Full or simplified
The rules allow small businesses a simplified plan, in which good hygiene practices replace the monitoring of critical points. The type is chosen while the plan is still a draft.
| Full | Simplified | |
|---|---|---|
| Hygiene prerequisites | Mandatory | Mandatory |
| Product sheets | Mandatory | Mandatory |
| Diagram verified on site | Mandatory | Mandatory |
| Determine and monitor CCPs | Mandatory to approve | Not required |
| Basis for a certification | Yes, as a starting point | No |
Who is responsible
Recipok proposes texts for the prerequisites, suggests hazards and calculates their classification from your answers to the decision tree, but no hazard is approved until a person signs it off, and who did it and when is recorded.
Legal responsibility for the plan always lies with the food business operator. Whatever you do not actually do stays out of the plan. Recipok helps you build and document it; it does not certify it.
What goes with the plan
Day-to-day temperatures, cleaning and pest control, with the checks that come from the plan.
Daily HACCP →Each product's sheet, approved and versioned, for the inspection.
Technical sheets →Times and temperatures for each lot, recorded on the production order.
Process control →What to prepare for the visit, with the manual and the records to hand.
Prepare for an inspection →Frequently asked questions
Create your account, load your recipes and generate the draft. We help you load them and, on the paid plans, you have a 15-day guarantee.